专题论文
An Assessment of Total Quality Management Implementation in Taiwan. Report on a Funded Research sponsored by the National Science Council of the Republic of China (NSC 75-0415- E002-01), August 4, 1993.
A Study on the Current Status and the Future of the Computer Integrated Manufacturing Systems in Taiwan’s Strategic Industries. Report on a Funded Research sponsored by the National Science Council of the Republic of China (NSC 75-0415-E002-01), July 16, 1986.
期刊论文(已审阅)
Lin, Man-Li and P. Y. Huang, "Using Target Costing To Manage Sporting Goods Supply Chain: A Case Study," International Journal of Strategic Cost Management, Vol.3, No. 2, (2009). Huang, P.Y., “Holonic Supply Chain Management: A Conceptual Framework,” Review of Business Research, Vol. IV, No. 1 (2004), pp.23-26.
Huang, P.Y., J. Lisboa, and C. F. Gomes “Global Supply Chain Management and Information Technology: a Portuguese Survey,” Review of Business Research, Vol.1, No. 1 (2003), pp.47-52.
Silva, J. P., J. Lisboa, and P. Y. Huang, “A Labour-Constrained Model for Aggregate Production Planning,” International Journal of Production Research, Vol.38, No. 9 (2000), pp.2143-2152.
Leu, Y., P. Y. Huang, and R. S. Russell, “Using Beam Search Techniques to Sequence Mixed Model Assembly Lines,” Annals of Operations Research, Vol. 70 (1997), pp.379-397.
Huang, P. Y., “The Growing Total Quality Management in Taiwan,” Quality Control Journal (in Chinese), Vol. 29, No. 11 (November 1993), pp. 15-23.
Russell, R. S., P. Y. Huang, and Y. Leu, “A Study of Labor Allocation Strategies in Cellular Manufacturing,” Decision Sciences, Vol. 22, No. 3 (July/August 1991), pp. 549-611.
Huang, P. Y., L. J. Moore, and S. Shin, “World Class Manufacturing in the 1990s: Integrating TQC, JIT, FA, and TPM with Worker Participation,” Manufacturing Review, Vol. 4, no. 2 (June 1991), pp. 87-95.
Huang. P. Y. and M. Sakurai, “Factory Automation: The Japanese Experience,” IEEE Transactions on Engineering Management, Vol. 37, No. 2 (May 1990), pp. 102-108.
Philipoom, P., L. P. Rees, B. W. Taylor, and P. Y. Huang, “A Mathematical Programming Approach for Determining Workcenter Lotsizes in a Just-in-Time System with Signal Kanbans,” International Journal of Production Research, Vol. 28, No. 1 (1990), pp. 1-15.
Huang, P. Y. and M. Sakurai, “An Assessment of Factory Automation in Japan: A General Mail Survey,” Manufacturing Review, Vol. 2, No. 3 (September 1989), pp. 162-169.
Rees, L. P., P. Y. Huang, and B. W. Taylor, “A Comparative Analysis of a MRP Lot-for-Lot System and a Kanban System for a Multistage Production Operation,” International Journal of Production Research, Vol. 27, No. 8 (1989), pp. 1427-1443.
Sakurai, M. and P. Y. Huang, “Practices of Management Accounting in FA Factories,” Senshu Journal of Management, (in Japanese), No. 46 (September 1988), pp. 53-79.
Rees, L. P., P. Philipoom, B. W. Taylor, and P. Y. Huang, “Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime,” IIE Transactions, Vol. 19, No. 2 (1987), pp. 199-207.
Philipoom, P., L. P. Rees, B. W. Taylor, and P. Y. Huang, “An Investigation of the Factors Influencing the Number of Kanbans Required in the Implementation of the JIT Technique with Kanbans,” International Journal of Production Research, Vol. 25, No. 3 (1987), pp. 457-472.
Huang, P. Y., “Analysis of the Buffer Behavior of Integrated Voice Data Communication Systems: A Network Simulation Approach,” Transactions of the Society for Computer Simulation, Vol. 3, No. 3 (July 1986), pp. 217-230.
Baker, W. M. and P. Y. Huang, “Group Technology and the Cost Accounting System,” Industrial Management, Vol. 28, No. 3 (May-June, 1986), pp. 24-26.
Huang, P. Y. and C. S. Chen, “Flexible Manufacturing System: An Overview and Bibliography,” Production and Inventory Management, Vol. 27, No. 3 (3rd Quarter, 1986), pp. 80-90.
Huang, P. Y., L. P. Rees, and B. W. Taylor, “Integrating the MRP-Based Control Level and the Multi-Stage Shop Level of a Manufacturing System via Network Simulation,” International Journal of Production Research, Vol. 23, No. 6 (1985), pp. 217-223.
Huang, P. Y. and B. L. W. Houck, “Cellular Manufacturing: An Overview and Bibliography,” Production and Inventory Management, Vol. 26, No. 4 (4th Quarter, 1985), pp. 83-92.
Ghandforoush, P., P. Y. Huang, and B. W. Taylor, “A Multi-Criteria Decision Model for the Selection of a Computerized Manufacturing Control System,” International Journal of Production Research, Vol. 23, No. 1 (1985), pp. 117-128.
Sakurai, M. and P. Y. Huang, “Japan’s Productivity Growth: A Managerial and Accounting Analysis,” Industrial Management, Vol. 26, No. 5 (September-October, 1984), pp. 11-18.
Huang, P. Y., “A Comparative Study of Priority Dispatching Rules in a Hybrid Assembly/Job Shop,” International Journal of Production Research, Vol. 22, No. 3 (1984), pp. 375-387.
Sakurai, M. and P. Y. Huang, “Main Issues of Japanese Productivity,” Business Accounting (Kiggyokaikei, in Japanese), Vol. 36, No. 6 (June 1984), pp. 23-31.
Huang, P. Y., L. J. Moore, and R. S. Russell, “Workload vs. Scheduling Policies in a Dual- Resource Constrained Job Shop,” Computers and Operations Research, Vol. 11, No. 1 (1984), pp. 37-47.
Huang, P. Y. and E. R. Clayton, “A Q-GERT Network Simulation Model for the Selection of Job Shop Scheduling Rules,” Review of Business and Economic Research, Vol. XIX, No. 1 (fall, 1983), pp. 1-12.
Huang, P. Y., L. P. Rees, and B. W. Taylor, “A Simulation Analysis of the Japanese Just-in-Time Technique (with Kanbans) for a Multiline, Multistage Production System,” Decision Sciences, Vol. 14, No. 3 (July, 1983), pp. 326-344
Huang, P. Y., P. R. Philipoom, and L. P. Rees, “Q-GERT vs. GPSS,” Journal of Systems Management, Vol. 34, No. 8 (August 1983), pp. 36-41.
Huang, P. Y., L. P. Rees, and B. W. Taylor, “A Simulation Analysis of the Japanese Just-in-Time Technique (with Kanbans) for a Multiline, Multistage Production System,” Decision Sciences, Vol. 14, No. 3 (July, 1983), pp. 326-344
Reprinted in: Yasuhiro Monden (editor), Applying Just-in-Time: The American/Japanese Experience. Norcross, Georgia: Industrial Engineering and Management Press, 1986, pp. 128-146.)
Huang, P. Y. and P. Ghandforoush, “Simulation Language Selection and Evaluation Model,” Journal of Systems Management, Vol. 34, No. 4 (April 1983), pp. 10-15.
Huang, P. Y., E. R. Clayton, and L. J. Moore, “Analysis of Material and Capacity Requirements with Q-GERT,” International Journal of Production Research, Vol. 20, No. 6 (November/December, 1982), pp. 701-713.
期刊论文(未审阅)
Huang, P. Y., “The Impact of Quality Revolution on POM Education,” Communications of the ICISA, Spring 1995, pp.4-7.
Huang, P. Y., “Factory Automation: What Can We Learn From Japan?” Managing Automation, Vol. 5, No. 3 (March 1990), pp. 6-7.
Huang, P. Y., “Japanese Toyota Management,” Postal Research Quarterly (in Chinese), No. 21 (June 1986), pp. 6-16.
Huang, P. Y. and P. Ghandforoush, “Industrial Robot Selection,” Industrial Engineering, Vol. 16, No. 4 (April 1984), pp. 44-48.
Reprinted in: Edward L. Fisher and Oded Z. Maimon (editors), Robotics and Industrial Engineering: Selected Readings, Vol. II. Norcross, Georgia: Industrial Engineering and Management Press, 1986, pp. 41-44.